跳到主要内容
← リソースセンター
TECHNICAL NOTE

ホットフィル検証チェックリスト:温度から輸送まで

ホットフィル案件の試作・量産前に確認する項目。

ホットフィル検証チェックリスト:温度から輸送まで

Validation for hot-fill projects should cover filling, cooling, sealing and transport.

Checklist

  • Fill temperature and holding time
  • Shrinkage, deformation and appearance after cooling
  • Neck, closure and seal integrity
  • Drop, stacking and transport simulation
  • Batch records and traceability information

Preparation

Prepare product images, capacity, neck finish, filling conditions and target market requirements so validation items can be agreed before sampling.

Next step

Review the existing validation report framework in downloads, or submit a project request for assessment.