TECHNICAL NOTE

핫필 검증 체크리스트: 온도에서 운송까지

핫필 프로젝트 샘플링·양산 전 확인 항목.

핫필 검증 체크리스트: 온도에서 운송까지

Validation for hot-fill projects should cover filling, cooling, sealing and transport.

Checklist

  • Fill temperature and holding time
  • Shrinkage, deformation and appearance after cooling
  • Neck, closure and seal integrity
  • Drop, stacking and transport simulation
  • Batch records and traceability information

Preparation

Prepare product images, capacity, neck finish, filling conditions and target market requirements so validation items can be agreed before sampling.

Next step

Review the existing validation report framework in downloads, or submit a project request for assessment.